THE PORT
The port buildings are being test fit until I decide on their final location. Once decided some changes to the ground contour will have to be made to to get them to fit properly. After that the background will be planned out marking roads or building flats. Then all the builds will be removed and the background painted and feeder wires will be added. The track has already been tested by running a string of cars over them.Saturday, 1 April 2023
Subscribe to:
Post Comments (Atom)
PD&LH, CURRIES
The backdrop at the right end of Woodstock, follows 59 highway south to Curries. When heading south in your car, from Woodstock you can sti...

-
After reading Bob Wheelers "Piedmont Division Cartridge Loading System" in Southeastern Region NMRA Vol. 50 I knew that was what...
-
All the retaining walls have been installed at Port Dover. Most of them are wood but behind the pier it is metal. The metal retaining wall...
-
Started thinking about the backdrop between Curries and Burgessville. I know 59 highway continues straight as it travels south of Burgessvi...
No comments:
Post a Comment