Thursday, 23 March 2023

Backdrop and tile installed

Ceiling tiles laid out on top of the 5/8 inch plywood  and the pattern of the harbor was transferred to them. The tiles were then cut on my bandsaw. The tiles and the 16 inch high backdrop were then nailed into place with my nail gun.

 





No comments:

Post a Comment

PD&LH, CURRIES

 The backdrop at the right end of Woodstock, follows 59 highway south to Curries. When heading south in your car, from Woodstock you can sti...